The Challenge

CBRE required backup cooling during the upgrade of critical infrastructure in Helsinki. The main system had to be replaced, but the infrastructure could not allow more than 6 hours of downtime. This demanded perfect planning and execution – no room for error or delays.

The Solution

Energyrent delivered three 170 kW dry coolers with dedicated pumps and control systems. The equipment was transported from Norway and installed via crane lift over the building. The team planned every detail to ensure a seamless transition within the critical 6-hour window.

The Result

The system replacement was completed without delays or complications. The client praised the team’s professionalism:
“Balder and Max were really quick and knew exactly what to do. True professionals!”
The project strengthened Energyrent’s relationship with CBRE for future assignments in the Nordics.

Is it urgent?

We are available and can deliver within 24 hours. You don't have to worry about installation, we'll handle it.

Call us at+47 51 68 88 68

Unsure about what you need?

We have extensive experience, and our skilled experts will help you find the right solution.

Critical backup cooling secured zero downtime in Helsinki - Energy Rent