Jump to main contentCall usAvailable 24/7/365

Prosjektfakta

600 kW electric boiler
Complete with pumps, expansion and monitoring

The Challenge

A client needed a reliable and environmentally friendly heat source to heat a building project throughout the winter months. The challenge lay in delivering a powerful but simultaneously emission-free solution that could meet large heating needs without compromising environmental goals.

The Solution

Energy Rent installed a 600 kW electric boiler that meets the requirements for emission-free operation. This solution was chosen for its ability to deliver high power without polluting emissions, and was equipped with the necessary pump and expansion system as well as integrated monitoring to ensure optimal operation reliability and efficiency.

The Result

The electric heating plant provided stable and efficient heat to the building project, enabling continued work on the building even under cold conditions. This helped keep the project on schedule and minimized delays while maintaining a high environmental standard.

Energy Rent's emission-free heating plant was essential to keep our construction project going through the winter. We are impressed with the reliable and efficient heat production and how easy it was to integrate the system with our construction processes.

- Project Manager

Is it urgent?

We are available and can deliver within 24 hours. You don't have to worry about installation, we'll handle it.

Call us at+47 51 68 88 68

Unsure about what you need?

We have extensive experience, and our skilled experts will help you find the right solution.