Prosjektfakta

Titanium plate exchanger
Integrated with existing heat pump
Improved heat absorption and energy efficiency

The Challenge

The Central Hospital in Stavanger wanted to increase the efficiency and capacity of its existing heat pump system. A solution was needed that could be integrated with the existing system without causing major disruptions to the hospital's operations, while at the same time being able to provide increased heat absorption and energy efficiency.

40501-mobil-varmeveksler-he-800-c_h

The Solution

Energy Rent rented out a high-efficiency titanium plate exchanger, which is known for its robustness and high heat transfer efficiency. This plate exchanger was integrated into the existing heat pump system to maximize heat absorption. The installation was carried out quickly and efficiently, with minimal disruption to the hospital's daily activities.

The Result

With the new titanium plate exchanger in place, the hospital experienced a noticeable improvement in the efficiency of the heat pump system. This contributed to reduced energy costs and improved environmental performance, which is important in the hospital's operations and sustainability goals. The performance improvements have also ensured a more stable and reliable heat supply to the hospital's facilities.

Energy Rent's contribution with the titanium plate exchanger was crucial in improving our heat pump system. We are impressed by the increased efficiency and reduced operating costs.

- Facilities Manager, Central Hospital in Stavanger

Is it urgent?

We are available and can deliver within 24 hours. You don't have to worry about installation, we'll handle it.

Call us at+47 51 68 88 68

Unsure about what you need?

We have extensive experience, and our skilled experts will help you find the right solution.