A cooling machine lowered the temperature to -15 °C
Dry ice was used to cool the surface temperature down to -40 °C

The Challenge

The challenge was to achieve and maintain this extremely low temperature.

The Solution

Energy Rent was contacted to find a suitable cooling solution for the pressure test. To achieve the goal of -40 °C surface temperature, Energy Rent implemented a two-stage approach. First, we lowered the temperature to -15 °C using a cooling machine. Then, dry ice was used to cool the surface temperature down to the desired level of -40 °C.

The Result

Thanks to Energy Rent's solution, the client was able to successfully perform the pressure test of the nitrogen tank. The two-stage approach with a cooling machine and dry ice proved effective in achieving the extremely low surface temperature necessary for the test. The client was pleased with the result and expressed their gratitude towards Energy Rent for their expertise and delivery of a tailored cooling solution that met their specific needs.

Energy Rent helped us achieve our goal during the pressure test of the nitrogen tank. Their solution with a cooling machine and dry ice proved to be very effective. We appreciate their expertise and tailored approach, and will definitely consider them again for future needs.

- Technical Manager

Is it urgent?

We are available and can deliver within 24 hours. You don't have to worry about installation, we'll handle it.

Call us at+47 51 68 88 68

Unsure about what you need?

We have extensive experience, and our skilled experts will help you find the right solution.